All the underground plumbing has been done, pipes for toilets, drains, shower, tub, kitchen has been installed, then topped off with more sand like material, now comes re bar to re-enforce, the radiant floor heating company will be next and then our finished concrete floor will be poured. At the end we will polish and seal the floor. There is no intention to use any covering like carpet, wood, tile.
Dave, our amazing contractor divided the space up into sections with a metal plate, hoping none of our concrete floor will crack in the future.