March 16, 2008
Concrete
So concrete was poured this week, this is a perimeter foundation and then dirt is compacted in the center and a slab is poured (cheaper than a 2foot slab)over top.
as you can see they started forming the Left garage better known as MY OFFICE.
Also the pipe for drainage is very important, it will connect everything that has to go through the sewer